{"id":284753,"date":"2026-08-04T15:49:37","date_gmt":"2026-08-04T13:49:37","guid":{"rendered":"https:\/\/www.heiwit.com\/?p=284753"},"modified":"2026-08-04T17:17:13","modified_gmt":"2026-08-04T15:17:13","slug":"planul-operational-privind-instalatiile-fotovoltaice-pentru-cladirile-publice","status":"publish","type":"post","link":"https:\/\/www.heiwit.com\/ro\/piano-operativo-fotovoltaico-edifici-pubblici\/","title":{"rendered":"De la poten\u021bial la planul opera\u021bional: cum se pot dota cl\u0103dirile publice cu panouri solare"},"content":{"rendered":"<div class=\"heiwit-pa-study\">\n<p class=\"heiwit-pa-lead\">Pasul decisiv nu const\u0103 \u00een a estima c\u00e2te panouri pot fi instalate pe acoperi\u0219uri, ci \u00een a transforma mii de suprafe\u021be \u00eentr-un flux organizat de proiecte care pot fi finan\u021bate, autorizate \u0219i realizate.<\/p>\n<div class=\"heiwit-pa-kpis\">\n<div><strong>2027<\/strong><span>pragul EPBD pentru cl\u0103diri publice cu o suprafa\u021b\u0103 mai mare de 2.000 m\u00b2<\/span><\/div>\n<div><strong>2028<\/strong><span>prag &gt;750 m\u00b2<\/span><\/div>\n<div><strong>2030<\/strong><span>prag &gt;250 m\u00b2<\/span><\/div>\n<div><strong>6 etape<\/strong><span>de la registrul de stare civil\u0103 la monitorizare<\/span><\/div>\n<\/div>\n<div class=\"heiwit-pa-warning\"><strong>Not\u0103 privind transparen\u021ba.<\/strong> Valorile de 5,68 GW, 7,53 TWh\/an \u0219i 6,8 miliarde de euro sunt rezultatele declarate de modelul Heiwit. Auditul documentar din 4 august 2026 nu a putut s\u0103 le reproduc\u0103 integral, deoarece din materialul primit lipseau seturile de date detaliate, codul, jurnalele API-urilor, rezultatele bootstrap, potrivirea GSE \u0219i fluxul de numerar. Limita este evident\u0103, nu ascuns\u0103.<\/div>\n<section class=\"heiwit-pa-carousel-section\" aria-labelledby=\"heiwit-pa-carousel-6-title\">\n<h2 id=\"heiwit-pa-carousel-6-title\">Capitolul \u00een 8 diapozitive<\/h2>\n<p class=\"heiwit-pa-carousel-intro\">Parcurge caruselul original creat pentru acest capitol. Imaginile au fost optimizate pentru web \u0219i \u00eenc\u0103rcate \u00een Biblioteca media a WordPress.<\/p>\n<div class=\"heiwit-pa-carousel\" data-heiwit-carousel tabindex=\"0\" aria-roledescription=\"carosello\" aria-label=\"De la poten\u021bial la planul opera\u021bional: cum se pot dota cl\u0103dirile publice cu panouri solare\"><span class=\"heiwit-pa-carousel-badge\">Slide originale \u00b7 date verificate \u00een text<\/span><\/p>\n<div class=\"heiwit-pa-carousel-viewport\" data-carousel-viewport>\n<div class=\"heiwit-pa-carousel-track\">\n<figure class=\"heiwit-pa-carousel-slide\" data-carousel-slide aria-label=\"Slide 1 din 8\"><img width=\"819\" height=\"1024\" src=\"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-01-5-819x1024.webp\" class=\"heiwit-pa-carousel-image\" alt=\"Poten\u021bialul exist\u0103: acum este nevoie de un plan opera\u021bional\" loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-01-5-819x1024.webp 819w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-01-5-240x300.webp 240w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-01-5-768x960.webp 768w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-01-5.webp 1080w\" sizes=\"(max-width: 819px) 100vw, 819px\" \/><figcaption><span>1\/8<\/span>Poten\u021bialul exist\u0103: acum este nevoie de un plan opera\u021bional<\/figcaption><\/figure>\n<figure class=\"heiwit-pa-carousel-slide\" data-carousel-slide aria-label=\"Slide 2 din 8\"><img width=\"819\" height=\"1024\" src=\"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-02-5-819x1024.webp\" class=\"heiwit-pa-carousel-image\" alt=\"Poten\u021bialul tehnic declarat al sistemelor fotovoltaice montate pe acoperi\u0219urile cl\u0103dirilor administra\u021biei publice\" loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-02-5-819x1024.webp 819w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-02-5-240x300.webp 240w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-02-5-768x960.webp 768w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-02-5.webp 1080w\" sizes=\"(max-width: 819px) 100vw, 819px\" \/><figcaption><span>2\/8<\/span>Poten\u021bialul tehnic declarat al sistemelor fotovoltaice montate pe acoperi\u0219urile cl\u0103dirilor administra\u021biei publice<\/figcaption><\/figure>\n<figure class=\"heiwit-pa-carousel-slide\" data-carousel-slide aria-label=\"Slide 3 din 8\"><img width=\"819\" height=\"1024\" src=\"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-03-5-819x1024.webp\" class=\"heiwit-pa-carousel-image\" alt=\"Produc\u021bia teoretic\u0103 \u0219i necesarul de energie electric\u0103 al sectorului public\" loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-03-5-819x1024.webp 819w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-03-5-240x300.webp 240w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-03-5-768x960.webp 768w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-03-5.webp 1080w\" sizes=\"(max-width: 819px) 100vw, 819px\" \/><figcaption><span>3\/8<\/span>Produc\u021bia teoretic\u0103 \u0219i necesarul de energie electric\u0103 al sectorului public<\/figcaption><\/figure>\n<figure class=\"heiwit-pa-carousel-slide\" data-carousel-slide aria-label=\"Slide 4 din 8\"><img width=\"819\" height=\"1024\" src=\"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-04-5-819x1024.webp\" class=\"heiwit-pa-carousel-image\" alt=\"CAPEX \u0219i NPV prezentate \u00een scenariul economic ini\u021bial\" loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-04-5-819x1024.webp 819w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-04-5-240x300.webp 240w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-04-5-768x960.webp 768w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-04-5.webp 1080w\" sizes=\"(max-width: 819px) 100vw, 819px\" \/><figcaption><span>4\/8<\/span>CAPEX \u0219i NPV prezentate \u00een scenariul economic ini\u021bial<\/figcaption><\/figure>\n<figure class=\"heiwit-pa-carousel-slide\" data-carousel-slide aria-label=\"Slide 5 din 8\"><img width=\"819\" height=\"1024\" src=\"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-05-5-819x1024.webp\" class=\"heiwit-pa-carousel-image\" alt=\"Prioritate pentru spitalele \u0219i \u0219colile de dimensiuni medii \u0219i mari din Sud \u0219i din Insule\" loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-05-5-819x1024.webp 819w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-05-5-240x300.webp 240w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-05-5-768x960.webp 768w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-05-5.webp 1080w\" sizes=\"(max-width: 819px) 100vw, 819px\" \/><figcaption><span>5\/8<\/span>Prioritate pentru spitalele \u0219i \u0219colile de dimensiuni medii \u0219i mari din Sud \u0219i din Insule<\/figcaption><\/figure>\n<figure class=\"heiwit-pa-carousel-slide\" data-carousel-slide aria-label=\"Slide 6 din 8\"><img width=\"819\" height=\"1024\" src=\"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-06-5-819x1024.webp\" class=\"heiwit-pa-carousel-image\" alt=\"CER, contribu\u021bii CAPEX \u0219i modele specializate pentru segmentele cele mai dificile\" loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-06-5-819x1024.webp 819w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-06-5-240x300.webp 240w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-06-5-768x960.webp 768w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-06-5.webp 1080w\" sizes=\"(max-width: 819px) 100vw, 819px\" \/><figcaption><span>6\/8<\/span>CER, contribu\u021bii CAPEX \u0219i modele specializate pentru segmentele cele mai dificile<\/figcaption><\/figure>\n<figure class=\"heiwit-pa-carousel-slide\" data-carousel-slide aria-label=\"Slide 7 din 8\"><img width=\"819\" height=\"1024\" src=\"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-07-5-819x1024.webp\" class=\"heiwit-pa-carousel-image\" alt=\"Reglement\u0103ri, fonduri \u0219i necesitatea unei guvernan\u021be unificate\" loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-07-5-819x1024.webp 819w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-07-5-240x300.webp 240w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-07-5-768x960.webp 768w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-07-5.webp 1080w\" sizes=\"(max-width: 819px) 100vw, 819px\" \/><figcaption><span>7\/8<\/span>Reglement\u0103ri, fonduri \u0219i necesitatea unei guvernan\u021be unificate<\/figcaption><\/figure>\n<figure class=\"heiwit-pa-carousel-slide\" data-carousel-slide aria-label=\"Slide 8 din 8\"><a class=\"heiwit-pa-carousel-report-link\" href=\"https:\/\/www.heiwit.com\/ro\/studio-potenziale-fotovoltaico-tetti-pubblica-amministrazione\/\" aria-label=\"Acceseaz\u0103 pagina principal\u0103 a studioului\"><img width=\"819\" height=\"1024\" src=\"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-08-5-819x1024.webp\" class=\"heiwit-pa-carousel-image\" alt=\"Re\u021beaua public\u0103 de distribu\u021bie a energiei electrice ca infrastructur\u0103 energetic\u0103 na\u021bional\u0103\" loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-08-5-819x1024.webp 819w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-08-5-240x300.webp 240w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-08-5-768x960.webp 768w, https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/slide-08-5.webp 1080w\" sizes=\"(max-width: 819px) 100vw, 819px\" \/><\/a><figcaption><span>8\/8<\/span>Re\u021beaua public\u0103 de distribu\u021bie a energiei electrice ca infrastructur\u0103 energetic\u0103 na\u021bional\u0103<\/figcaption><\/figure>\n<\/div>\n<\/div>\n<p><button class=\"heiwit-pa-carousel-control prev\" type=\"button\" data-carousel-prev aria-label=\"Afi\u0219eaz\u0103 diapozitivul anterior\"><span aria-hidden=\"true\">\u2039<\/span><\/button><button class=\"heiwit-pa-carousel-control next\" type=\"button\" data-carousel-next aria-label=\"Afi\u0219eaz\u0103 diapozitivul urm\u0103tor\"><span aria-hidden=\"true\">\u203a<\/span><\/button><\/p>\n<div class=\"heiwit-pa-carousel-footer\">\n<div class=\"heiwit-pa-carousel-dots\" data-carousel-dots role=\"tablist\" aria-label=\"Selecteaz\u0103 un slide\"><button type=\"button\" data-carousel-dot=\"0\" role=\"tab\" aria-label=\"Mergi la diapozitivul 1\" aria-selected=\"true\"><\/button><button type=\"button\" data-carousel-dot=\"1\" role=\"tab\" aria-label=\"Mergi la diapozitivul 2\" aria-selected=\"false\"><\/button><button type=\"button\" data-carousel-dot=\"2\" role=\"tab\" aria-label=\"Mergi la diapozitivul 3\" aria-selected=\"false\"><\/button><button type=\"button\" data-carousel-dot=\"3\" role=\"tab\" aria-label=\"Mergi la diapozitivul 4\" aria-selected=\"false\"><\/button><button type=\"button\" data-carousel-dot=\"4\" role=\"tab\" aria-label=\"Mergi la diapozitivul 5\" aria-selected=\"false\"><\/button><button type=\"button\" data-carousel-dot=\"5\" role=\"tab\" aria-label=\"Mergi la diapozitivul 6\" aria-selected=\"false\"><\/button><button type=\"button\" data-carousel-dot=\"6\" role=\"tab\" aria-label=\"Mergi la diapozitivul 7\" aria-selected=\"false\"><\/button><button type=\"button\" data-carousel-dot=\"7\" role=\"tab\" aria-label=\"Mergi la diapozitivul 8\" aria-selected=\"false\"><\/button><\/div>\n<div class=\"heiwit-pa-carousel-counter\" aria-live=\"polite\"><span data-carousel-current>1<\/span><span aria-hidden=\"true\"> \/ <\/span>8<\/div>\n<\/div>\n<p class=\"heiwit-pa-carousel-hint\">Pe smartphone, gliseaz\u0103 lateral. De pe tastatur\u0103, folose\u0219te s\u0103ge\u021bile spre dreapta \u0219i spre st\u00e2nga.<\/p>\n<div class=\"heiwit-pa-carousel-audit\"><strong>Not\u0103 de audit privind schema de tip \u201ecarusel\u201d.<\/strong> Prezentarea rezum\u0103, de asemenea, rezultate economice ini\u021biale care nu au fost \u00eenc\u0103 confirmate. Planul opera\u021bional r\u0103m\u00e2ne o propunere editorial\u0103; cifrele economice trebuie interpretate \u021bin\u00e2nd cont de rezervele exprimate \u00een raportul de audit.<\/div>\n<\/div>\n<\/section>\n<h2>Contextul european<\/h2>\n<p>Directiva (UE) 2024\/1275, articolul 10, introduce cerin\u021be progresive pentru instala\u021biile solare eligibile, \u00een m\u0103sura \u00een care acestea sunt fezabile din punct de vedere tehnic, economic \u0219i func\u021bional \u0219i \u00een conformitate cu transpunerea na\u021bional\u0103. Pentru cl\u0103dirile publice existente, directiva prevede praguri de peste 2 000 m\u00b2 p\u00e2n\u0103 la 31 decembrie 2027, 750 m\u00b2 p\u00e2n\u0103 \u00een 2028 \u0219i 250 m\u00b2 p\u00e2n\u0103 \u00een 2030.<\/p>\n<p>Nu este corect s\u0103 se sintetizeze norma ca o obliga\u021bie absolut\u0103 pentru fiecare cl\u0103dire public\u0103 cu o suprafa\u021b\u0103 mai mare de 250 m\u00b2. Fezabilitatea \u0219i transpunerea sunt elemente esen\u021biale ale dispozi\u021biei.<\/p>\n<h2>Un plan de ac\u021biune \u00een \u0219ase etape<\/h2>\n<ol>\n<li><strong>Date de identitate verificate:<\/strong> integrarea OSM cu surse institu\u021bionale, propriet\u0103\u021bi, coduri de identificare ale imobilelor \u0219i puncte de conectare.<\/li>\n<li><strong>Verificare tehnic\u0103 preliminar\u0103:<\/strong> acoperi\u0219, structur\u0103, restric\u021bii, m\u0103suri de protec\u021bie \u00eempotriva incendiilor, umbre, c\u0103i de acces \u0219i starea de \u00eentre\u021binere.<\/li>\n<li><strong>Date privind energia:<\/strong> consumul orar, puterea consumat\u0103, tarifele, continuitatea serviciului \u0219i posibilitatea de partajare.<\/li>\n<li><strong>Stabilirea priorit\u0103\u021bilor:<\/strong> clasificarea cl\u0103dirilor \u00een func\u021bie de fezabilitate, autoconsum, cost unitar, impact \u0219i rapiditatea ob\u021binerii autoriza\u021biilor.<\/li>\n<li><strong>Model de punere \u00een aplicare:<\/strong> achizi\u021bie direct\u0103, ESCO, concesiune, parteneriat, comunitate energetic\u0103 sau combina\u021bii conforme cu legisla\u021bia.<\/li>\n<li><strong>Execu\u021bie \u0219i monitorizare:<\/strong> caiete de sarcini standard, loturi teritoriale, indicatori-cheie de performan\u021b\u0103 (KPI), monitorizare la distan\u021b\u0103, \u00eentre\u021binere \u0219i publicarea rezultatelor.<\/li>\n<\/ol>\n<h2>Care cl\u0103diri s\u0103 le abord\u0103m mai \u00eent\u00e2i?<\/h2>\n<p>Modelul preliminar indic\u0103 spitalele \u0219i \u0219colile de dimensiuni medii \u0219i mari din sudul \u021b\u0103rii \u0219i din insule ca posibile clustere prioritare, datorit\u0103 dimensiunilor \u0219i poten\u021bialului de produc\u021bie. Aceast\u0103 indica\u021bie r\u0103m\u00e2ne o ipotez\u0103 opera\u021bional\u0103 p\u00e2n\u0103 c\u00e2nd IRR \u0219i perioada de recuperare a investi\u021biei nu vor fi confirmate. \u00cen practic\u0103, un acoperi\u0219 de mari dimensiuni nu reprezint\u0103 o prioritate dac\u0103 prezint\u0103 constr\u00e2ngeri structurale, conexiuni dificile sau consumuri incompatibile.<\/p>\n<h2>Guvernan\u021b\u0103 \u0219i agregare<\/h2>\n<p>Fragmentarea administrativ\u0103 poate fi redus\u0103 prin structuri de sprijin centrale sau regionale: registru comun, modele de licita\u021bie, contracte-tip, asisten\u021b\u0103 tehnic\u0103 \u0219i gruparea loturilor. Cl\u0103dirile mai mari pot sus\u021bine proiecte autonome; cele mici pot fi grupate pentru a reduce costurile de tranzac\u021bie.<\/p>\n<h2>ESCo \u0219i comunit\u0103\u021bile energetice<\/h2>\n<p>Modelul ESCo poate transfera o parte din investi\u021bie \u0219i din risc c\u0103tre un operator privat, dar necesit\u0103 contracte clare privind economiile, proprietatea, \u00eentre\u021binerea \u0219i durata. Comunit\u0103\u021bile energetice pot valorifica energia partajat\u0103 la nivel local, dar nu \u00eenlocuiesc analiza punctului de racordare \u0219i a normelor \u00een vigoare.<\/p>\n<h2>Rezultatul final al studiului<\/h2>\n<p>Etapa urm\u0103toare nu ar trebui s\u0103 fie doar un raport mai detaliat. Ar trebui s\u0103 genereze o baz\u0103 de date versi\u021bionat\u0103 cu starea de verificare, un clasament al cl\u0103dirilor, criterii u\u0219or de \u00een\u021beles, seturi de date agregate care pot fi publicate, un registru al surselor \u0219i un plan de actualizare. Astfel, o cercetare editorial\u0103 devine o infrastructur\u0103 decizional\u0103.<\/p>\n<h2>Concluzie<\/h2>\n<p>Poten\u021bialul exist\u0103, dar valoarea public\u0103 se na\u0219te din punerea \u00een practic\u0103. A face vizibile chiar \u0219i erorile \u0219i datele lips\u0103 este primul pas pentru a construi un flux de date credibil \u0219i care poate fi citat.<\/p>\n<div class=\"heiwit-pa-series\"><strong>Seria complet\u0103<\/strong><\/p>\n<ol>\n<li><a href=\"https:\/\/www.heiwit.com\/ro\/fotovoltaico-tetti-pubblici-pniec-2030\/\">Acoperi\u0219uri publice \u0219i PNIEC 2030<\/a><\/li>\n<li><a href=\"https:\/\/www.heiwit.com\/ro\/metodo-stima-potenziale-fotovoltaico-edifici-pubblici\/\">Cum a fost realizat modelul<\/a><\/li>\n<li><a href=\"https:\/\/www.heiwit.com\/ro\/potenziale-fotovoltaico-tetti-pa-568-gw-753-twh\/\">5,68 GW \u0219i 7,53 TWh: rezultate \u0219i semnifica\u021bie<\/a><\/li>\n<li><a href=\"https:\/\/www.heiwit.com\/ro\/costo-fotovoltaico-tetti-pubblici-capex-lcoe\/\">Economia interven\u021biei<\/a><\/li>\n<li><a href=\"https:\/\/www.heiwit.com\/ro\/pubblica-amministrazione-autosufficienza-energia-fotovoltaico\/\">Energie, autoconsum \u0219i emisii<\/a><\/li>\n<li><a href=\"https:\/\/www.heiwit.com\/ro\/piano-operativo-fotovoltaico-edifici-pubblici\/\">De la poten\u021bial la planul opera\u021bional<\/a><\/li>\n<\/ol>\n<\/div>\n<aside class=\"heiwit-pa-cta\">\n<h2>Consulta\u021bi studiul complet<\/h2>\n<p>Metodologia, rezultatele, limitele auditului \u0219i toate detaliile sunt prezentate pe pagina principal\u0103 a studioului Heiwit.<\/p>\n<div class=\"heiwit-pa-cta-actions\"><a class=\"heiwit-pa-button\" href=\"https:\/\/www.heiwit.com\/ro\/studio-potenziale-fotovoltaico-tetti-pubblica-amministrazione\/\">Acceseaz\u0103 studiul complet<\/a><a class=\"heiwit-pa-button secondary\" href=\"https:\/\/www.heiwit.com\/ro\/contactati-ne\/\">Contacteaz\u0103 Heiwit<\/a><\/div>\n<\/aside>\n<div class=\"heiwit-pa-sources\">\n<h2>Surse \u0219i referin\u021be<\/h2>\n<ul>\n<li><a href=\"https:\/\/eur-lex.europa.eu\/legal-content\/IT\/TXT\/HTML\/?uri=OJ:L_202401275\" target=\"_blank\" rel=\"noopener\">Directiva (UE) 2024\/1275, articolul 10<\/a><\/li>\n<li><a href=\"https:\/\/www.openstreetmap.org\/copyright\/it\" target=\"_blank\" rel=\"noopener\">OpenStreetMap \u2014 drepturi de autor \u0219i licen\u021ba ODbL<\/a><\/li>\n<li><a href=\"https:\/\/www.mase.gov.it\/portale\/documents\/d\/guest\/pniec_2024_revfin_01072024-pdf\" target=\"_blank\" rel=\"noopener\">MASE \u2014 Planul na\u021bional integrat pentru energie \u0219i clim\u0103, versiunea definitiv\u0103 2024<\/a><\/li>\n<\/ul>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>O foaie de parcurs concret\u0103 care cuprinde registrul de date, fezabilitatea, EPBD, ESCO, comunit\u0103\u021bile energetice, licita\u021biile \u0219i monitorizarea.<\/p>","protected":false},"author":1,"featured_media":284744,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","content-type":"","footnotes":""},"categories":[122],"tags":[144,145,143,140,146],"class_list":["post-284753","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-studi-e-ricerche","tag-comunita-energetiche","tag-edifici-pubblici","tag-epbd","tag-esco","tag-governance-energetica"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Piano operativo per il fotovoltaico sugli edifici pubblici<\/title>\n<meta name=\"description\" content=\"Roadmap in sei fasi per trasformare il potenziale dei tetti pubblici in progetti: EPBD, ESCo, CER e governance.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.heiwit.com\/ro\/planul-operational-privind-instalatiile-fotovoltaice-pentru-cladirile-publice\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Piano operativo per il fotovoltaico sugli edifici pubblici\" \/>\n<meta property=\"og:description\" content=\"Roadmap in sei fasi per trasformare il potenziale dei tetti pubblici in progetti: EPBD, ESCo, CER e governance.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.heiwit.com\/ro\/planul-operational-privind-instalatiile-fotovoltaice-pentru-cladirile-publice\/\" \/>\n<meta property=\"og:site_name\" content=\"Heiwit - Batterie agli ioni di Sodio\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/heiwit.italia\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-04T13:49:37+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-04T15:17:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/06-piano.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"master_heiwit\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Scris de\" \/>\n\t<meta name=\"twitter:data1\" content=\"master_heiwit\" \/>\n\t<meta name=\"twitter:label2\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.heiwit.com\\\/piano-operativo-fotovoltaico-edifici-pubblici\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.heiwit.com\\\/piano-operativo-fotovoltaico-edifici-pubblici\\\/\"},\"author\":{\"name\":\"master_heiwit\",\"@id\":\"https:\\\/\\\/www.heiwit.com\\\/#\\\/schema\\\/person\\\/ae9ed97deab943ecf7ae6cd0b69c0701\"},\"headline\":\"Dal potenziale al piano operativo: come solarizzare gli edifici pubblici\",\"datePublished\":\"2026-08-04T13:49:37+00:00\",\"dateModified\":\"2026-08-04T15:17:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.heiwit.com\\\/piano-operativo-fotovoltaico-edifici-pubblici\\\/\"},\"wordCount\":714,\"publisher\":{\"@id\":\"https:\\\/\\\/www.heiwit.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.heiwit.com\\\/piano-operativo-fotovoltaico-edifici-pubblici\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.heiwit.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/06-piano.jpg\",\"keywords\":[\"comunit\u00e0 energetiche\",\"edifici pubblici\",\"EPBD\",\"ESCo\",\"governance energetica\"],\"articleSection\":[\"Studi e ricerche\"],\"inLanguage\":\"ro-RO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.heiwit.com\\\/piano-operativo-fotovoltaico-edifici-pubblici\\\/\",\"url\":\"https:\\\/\\\/www.heiwit.com\\\/piano-operativo-fotovoltaico-edifici-pubblici\\\/\",\"name\":\"Piano operativo per il fotovoltaico sugli edifici pubblici\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.heiwit.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.heiwit.com\\\/piano-operativo-fotovoltaico-edifici-pubblici\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.heiwit.com\\\/piano-operativo-fotovoltaico-edifici-pubblici\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.heiwit.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/06-piano.jpg\",\"datePublished\":\"2026-08-04T13:49:37+00:00\",\"dateModified\":\"2026-08-04T15:17:13+00:00\",\"description\":\"Roadmap in sei fasi per trasformare il potenziale dei tetti pubblici in progetti: EPBD, ESCo, CER e governance.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.heiwit.com\\\/piano-operativo-fotovoltaico-edifici-pubblici\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.heiwit.com\\\/piano-operativo-fotovoltaico-edifici-pubblici\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/www.heiwit.com\\\/piano-operativo-fotovoltaico-edifici-pubblici\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.heiwit.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/06-piano.jpg\",\"contentUrl\":\"https:\\\/\\\/www.heiwit.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/06-piano.jpg\",\"width\":1600,\"height\":900,\"caption\":\"Elaborazione grafica Heiwit S.p.A. Non raffigura uno specifico edificio pubblico n\u00e9 una configurazione impiantistica reale.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.heiwit.com\\\/piano-operativo-fotovoltaico-edifici-pubblici\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.heiwit.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Dal potenziale al piano operativo: come solarizzare gli edifici pubblici\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.heiwit.com\\\/#website\",\"url\":\"https:\\\/\\\/www.heiwit.com\\\/\",\"name\":\"Heiwit\",\"description\":\"Transizione energetica sostenibile\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.heiwit.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.heiwit.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.heiwit.com\\\/#organization\",\"name\":\"Heiwit S.p.A.\",\"url\":\"https:\\\/\\\/www.heiwit.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/www.heiwit.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.heiwit.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/www.heiwit.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/logo.png\",\"width\":834,\"height\":239,\"caption\":\"Heiwit S.p.A.\"},\"image\":{\"@id\":\"https:\\\/\\\/www.heiwit.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/heiwit.italia\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/heiwit\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@Heiwit.italia\",\"https:\\\/\\\/www.instagram.com\\\/heiwit.spa\\\/\"],\"legalName\":\"Heiwit S.p.A.\",\"telephone\":\"+3903321730555\",\"vatID\":\"IT03980400125\",\"taxID\":\"03980400125\",\"description\":\"Produzione e installazione di sistemi di accumulo agli ioni di sodio per impianti fotovoltaici residenziali, commerciali e industriali.\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Via Carlo Robbioni, 2\",\"postalCode\":\"21100\",\"addressLocality\":\"Varese\",\"addressRegion\":\"VA\",\"addressCountry\":\"IT\"},\"location\":{\"@type\":\"Place\",\"name\":\"Sede operativa Heiwit\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Via Papa Giovanni XXIII, 126\",\"postalCode\":\"21042\",\"addressLocality\":\"Caronno Pertusella\",\"addressRegion\":\"VA\",\"addressCountry\":\"IT\"}},\"contactPoint\":{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"telephone\":\"+3903321730555\",\"availableLanguage\":[\"Italian\",\"English\",\"German\"]},\"areaServed\":[\"IT\",\"DE\",\"CH\",\"AT\",\"FR\",\"ES\",\"PL\",\"RO\",\"CZ\",\"SE\",\"GR\",\"NL\",\"HU\",\"PT\",\"GB\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.heiwit.com\\\/#\\\/schema\\\/person\\\/ae9ed97deab943ecf7ae6cd0b69c0701\",\"name\":\"master_heiwit\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e4d7c19d681897eef8bc3be5094ea6f903e14247c031c8eb3ccee6380f3bf1a1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e4d7c19d681897eef8bc3be5094ea6f903e14247c031c8eb3ccee6380f3bf1a1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e4d7c19d681897eef8bc3be5094ea6f903e14247c031c8eb3ccee6380f3bf1a1?s=96&d=mm&r=g\",\"caption\":\"master_heiwit\"},\"sameAs\":[\"https:\\\/\\\/www.heiwit.com\"],\"url\":\"https:\\\/\\\/www.heiwit.com\\\/ro\\\/author\\\/master_heiwit\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Piano operativo per il fotovoltaico sugli edifici pubblici","description":"Roadmap in sei fasi per trasformare il potenziale dei tetti pubblici in progetti: EPBD, ESCo, CER e governance.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.heiwit.com\/ro\/planul-operational-privind-instalatiile-fotovoltaice-pentru-cladirile-publice\/","og_locale":"ro_RO","og_type":"article","og_title":"Piano operativo per il fotovoltaico sugli edifici pubblici","og_description":"Roadmap in sei fasi per trasformare il potenziale dei tetti pubblici in progetti: EPBD, ESCo, CER e governance.","og_url":"https:\/\/www.heiwit.com\/ro\/planul-operational-privind-instalatiile-fotovoltaice-pentru-cladirile-publice\/","og_site_name":"Heiwit - Batterie agli ioni di Sodio","article_publisher":"https:\/\/www.facebook.com\/heiwit.italia","article_published_time":"2026-08-04T13:49:37+00:00","article_modified_time":"2026-08-04T15:17:13+00:00","og_image":[{"width":1600,"height":900,"url":"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/06-piano.jpg","type":"image\/jpeg"}],"author":"master_heiwit","twitter_card":"summary_large_image","twitter_misc":{"Scris de":"master_heiwit","Timp estimat pentru citire":"3 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.heiwit.com\/piano-operativo-fotovoltaico-edifici-pubblici\/#article","isPartOf":{"@id":"https:\/\/www.heiwit.com\/piano-operativo-fotovoltaico-edifici-pubblici\/"},"author":{"name":"master_heiwit","@id":"https:\/\/www.heiwit.com\/#\/schema\/person\/ae9ed97deab943ecf7ae6cd0b69c0701"},"headline":"Dal potenziale al piano operativo: come solarizzare gli edifici pubblici","datePublished":"2026-08-04T13:49:37+00:00","dateModified":"2026-08-04T15:17:13+00:00","mainEntityOfPage":{"@id":"https:\/\/www.heiwit.com\/piano-operativo-fotovoltaico-edifici-pubblici\/"},"wordCount":714,"publisher":{"@id":"https:\/\/www.heiwit.com\/#organization"},"image":{"@id":"https:\/\/www.heiwit.com\/piano-operativo-fotovoltaico-edifici-pubblici\/#primaryimage"},"thumbnailUrl":"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/06-piano.jpg","keywords":["comunit\u00e0 energetiche","edifici pubblici","EPBD","ESCo","governance energetica"],"articleSection":["Studi e ricerche"],"inLanguage":"ro-RO"},{"@type":"WebPage","@id":"https:\/\/www.heiwit.com\/piano-operativo-fotovoltaico-edifici-pubblici\/","url":"https:\/\/www.heiwit.com\/piano-operativo-fotovoltaico-edifici-pubblici\/","name":"Piano operativo per il fotovoltaico sugli edifici pubblici","isPartOf":{"@id":"https:\/\/www.heiwit.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.heiwit.com\/piano-operativo-fotovoltaico-edifici-pubblici\/#primaryimage"},"image":{"@id":"https:\/\/www.heiwit.com\/piano-operativo-fotovoltaico-edifici-pubblici\/#primaryimage"},"thumbnailUrl":"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/06-piano.jpg","datePublished":"2026-08-04T13:49:37+00:00","dateModified":"2026-08-04T15:17:13+00:00","description":"Roadmap in sei fasi per trasformare il potenziale dei tetti pubblici in progetti: EPBD, ESCo, CER e governance.","breadcrumb":{"@id":"https:\/\/www.heiwit.com\/piano-operativo-fotovoltaico-edifici-pubblici\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.heiwit.com\/piano-operativo-fotovoltaico-edifici-pubblici\/"]}]},{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/www.heiwit.com\/piano-operativo-fotovoltaico-edifici-pubblici\/#primaryimage","url":"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/06-piano.jpg","contentUrl":"https:\/\/www.heiwit.com\/wp-content\/uploads\/2026\/08\/06-piano.jpg","width":1600,"height":900,"caption":"Elaborazione grafica Heiwit S.p.A. Non raffigura uno specifico edificio pubblico n\u00e9 una configurazione impiantistica reale."},{"@type":"BreadcrumbList","@id":"https:\/\/www.heiwit.com\/piano-operativo-fotovoltaico-edifici-pubblici\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.heiwit.com\/"},{"@type":"ListItem","position":2,"name":"Dal potenziale al piano operativo: come solarizzare gli edifici pubblici"}]},{"@type":"WebSite","@id":"https:\/\/www.heiwit.com\/#website","url":"https:\/\/www.heiwit.com\/","name":"Heiwit","description":"Tranzi\u021bia energetic\u0103 durabil\u0103","publisher":{"@id":"https:\/\/www.heiwit.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.heiwit.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/www.heiwit.com\/#organization","name":"Heiwit S.p.A.","url":"https:\/\/www.heiwit.com\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/www.heiwit.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.heiwit.com\/wp-content\/uploads\/2025\/09\/logo.png","contentUrl":"https:\/\/www.heiwit.com\/wp-content\/uploads\/2025\/09\/logo.png","width":834,"height":239,"caption":"Heiwit S.p.A."},"image":{"@id":"https:\/\/www.heiwit.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/heiwit.italia","https:\/\/www.linkedin.com\/company\/heiwit\/","https:\/\/www.youtube.com\/@Heiwit.italia","https:\/\/www.instagram.com\/heiwit.spa\/"],"legalName":"Heiwit S.p.A.","telephone":"+3903321730555","vatID":"IT03980400125","taxID":"03980400125","description":"Produc\u021bia \u0219i instalarea sistemelor de stocare cu ioni de sodiu pentru instala\u021bii fotovoltaice reziden\u021biale, comerciale \u0219i industriale.","address":{"@type":"PostalAddress","streetAddress":"Via Carlo Robbioni, 2","postalCode":"21100","addressLocality":"Varese","addressRegion":"VA","addressCountry":"IT"},"location":{"@type":"Place","name":"Sede operativa Heiwit","address":{"@type":"PostalAddress","streetAddress":"Via Papa Giovanni XXIII, 126","postalCode":"21042","addressLocality":"Caronno Pertusella","addressRegion":"VA","addressCountry":"IT"}},"contactPoint":{"@type":"ContactPoint","contactType":"sales","telephone":"+3903321730555","availableLanguage":["Italian","English","German"]},"areaServed":["IT","DE","CH","AT","FR","ES","PL","RO","CZ","SE","GR","NL","HU","PT","GB"]},{"@type":"Person","@id":"https:\/\/www.heiwit.com\/#\/schema\/person\/ae9ed97deab943ecf7ae6cd0b69c0701","name":"master_heiwit","image":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/secure.gravatar.com\/avatar\/e4d7c19d681897eef8bc3be5094ea6f903e14247c031c8eb3ccee6380f3bf1a1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e4d7c19d681897eef8bc3be5094ea6f903e14247c031c8eb3ccee6380f3bf1a1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e4d7c19d681897eef8bc3be5094ea6f903e14247c031c8eb3ccee6380f3bf1a1?s=96&d=mm&r=g","caption":"master_heiwit"},"sameAs":["https:\/\/www.heiwit.com"],"url":"https:\/\/www.heiwit.com\/ro\/author\/master_heiwit\/"}]}},"_links":{"self":[{"href":"https:\/\/www.heiwit.com\/ro\/wp-json\/wp\/v2\/posts\/284753","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.heiwit.com\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.heiwit.com\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.heiwit.com\/ro\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.heiwit.com\/ro\/wp-json\/wp\/v2\/comments?post=284753"}],"version-history":[{"count":9,"href":"https:\/\/www.heiwit.com\/ro\/wp-json\/wp\/v2\/posts\/284753\/revisions"}],"predecessor-version":[{"id":284924,"href":"https:\/\/www.heiwit.com\/ro\/wp-json\/wp\/v2\/posts\/284753\/revisions\/284924"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.heiwit.com\/ro\/wp-json\/wp\/v2\/media\/284744"}],"wp:attachment":[{"href":"https:\/\/www.heiwit.com\/ro\/wp-json\/wp\/v2\/media?parent=284753"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.heiwit.com\/ro\/wp-json\/wp\/v2\/categories?post=284753"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.heiwit.com\/ro\/wp-json\/wp\/v2\/tags?post=284753"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}